Qolhak (Parishad) Residential Project
An eight-storey residential building in Qolhak, District 3 of Tehran — currently in the foundation and rebar stage.
View ProjectShahrara Asar Consulting Engineers
Shahrara Asar Consulting Engineers has practised in eastern Tehran since 1995. The firm began with municipal permit files and residential design, and now carries a project from the first zoning enquiry through to the registered deeds of the finished units.
0+
Years of experience
0+
Projects delivered
0+
Permits & certificates
0%
Client satisfaction
What we do for you
First the legal status and regulations become clear, then the design takes shape, and finally construction runs under supervision.
Architecture that balances your taste, municipal regulations and project economics — from concept to complete working drawings.
Service DetailsWe handle the entire building-permit process — from opening the municipality file to permit issuance — with no in-person follow-up required from you.
Service DetailsTimeless facades approved by the municipal facade committee, and interiors built around how you live.
Service DetailsConcrete and steel structural design per the latest national building codes and Standard 2800.
Service DetailsMEP design and supervision — from approval drawings to mechanical-room details and smart-home systems.
Service DetailsSpecialist follow-up of construction paperwork: violation clearances, completion certificate, subdivision minutes and title deeds.
Service Details
Online Advisory Desk
Send us the address and whatever documents you have — you get the file status, buildable capacity and a recommended path the same working day.
What we have built
An eight-storey residential building in Qolhak, District 3 of Tehran — currently in the foundation and rebar stage.
View ProjectA six-unit residential building with a stone-and-wood facade; permit to completion by Shahrara Asar.
View ProjectAn eight-unit luxury building in Pasdaran with a grand lobby, full smart-home systems and premium materials.
View ProjectFrom site to handover
Projects
1405-05-06 00:00:00
A six-unit residential building on Piroozi Street was handed over to its owners after 26 months on site. Shahrara Asar carried the project from the first drawing to the final municipal clearance.
1405-04-30 00:00:00
Filing stage supervision reports on time is what keeps a case moving toward its completion certificate. A delay at any stage triggers a chain of stoppages, and the owner ends up paying for it.
1405-04-18 00:00:00
A joint construction agreement for a 300-square-metre property in District 14 has been signed with our office acting as the owner's technical adviser, and demolition is under way. Preliminary drawings were prepared before signing so that the equity split could be based on a defined scheme.
Educational Article
From opening the file to permit issuance: everything owners should know about the process, documents, costs and timeline.
Trust is built
Our file had been stuck on a street setback for two years and nobody could say exactly why. At the first meeting the engineer compared the registry plan with the existing site and traced the discrepancy to an outdated enquiry. The permit was issued four months later.
Masoud Rahmani
Owner, six-unit residential building, Piroozi
The property had three owners on one undivided deed. They handled the subdivision and the registry certificate, and each unit ended up with its own single-page deed. Whenever a document was needed, they said exactly which office and which form.
Shahin Mousavi
Representative of the heirs, older property in Shokoufeh
I have worked with two other consultancies. The difference here was the weekly site report: photographs, percentage complete, and what needed correcting. When one slab's concrete came back under strength, they raised it themselves before the next pour.
Behnam Azari
Investor, two residential projects in District 14
Their Trust in Us
Next Step
One free consultation is enough to map your project's path.